• Bagged Contract on Turnkey basis for 230 /110 KV AIS Substation 2015

    The Broad scope includes Design , Detailed Fabrication , Engineering , Manufacture , Supply , Erection , Testing and Commissioning of 230-11…

    April
    15 2015
  • Bagged Contract from M/s Ashoka Buildcon Ltd for RAPDRP Project At Chennai 2014

    Execution of Distribution strengthening works under "Re-structured Accelerated Power Development and Reforms Programme (R-APDRP) Part-B" in …

    January
    20 2014
  • Adoption of Vision Centre at Mandasa Village for Rural Eye Treatment 2013

    The Concept of Vision Centre (Free Permanent Eye Testing Centre for Prevention of Eye Health on Permanent Basis) aims to provide.Eye Examina…

    January
    24 2013